160 Aldersgate

McLaren Construction

Client

McLaren Construction

Project

160 Aldersgate

Value

£1.7m

Duration

Scope

The 1980’s office block underwent a full replacement of the existing façade; a dramatic reconfiguration of the existing atrium and the main entrance; reconfiguration of existing floor space to optimise the use of basement, ground floor and office areas and the introduction of open roof terraces plus the addition of an extra floor.

No items found.
No items found.